Metro picks larger design for new Cornelius garbage and recycling drop-off site
Metro plans a new drop-off site in Cornelius where people and small businesses can bring household hazardous waste, recycling, reusable items and garbage. The council chose the larger 7-acre design, called Option B, which has more space for reuse, community events, green space and future growth. A small temporary site for household hazardous waste would open first while the permanent depot is designed.
Decision: Passed, 6 to 1. Mary Nolan voted no.
Who it affects: Washington County residents and small businesses, with the share of county residents within a 20-minute drive of a full-service depot expected to rise from 5% to 40% when the depot is finished.
Money: The larger design is estimated at about $23 million to build, compared with about $17 million for the smaller option. The temporary hazardous waste site is estimated at about $3 million, paid from Metro waste revenues and reserves. Staff expect to pay for the permanent depot with revenue bonds (borrowed money repaid from fees), but this vote does not approve borrowing or construction.
Next: Staff will continue design and engineering and update the council from time to time. Final design, cost, borrowing and construction need later council votes. The City of Cornelius Planning Commission must also approve land use permits after a public hearing.
Official record
Waxaa qoray AI iyadoo ka duulaysa diiwaanka rasmiga ah, si toos ah ayaana loo hubiyay. Oktoobar 1, 2026
Qoraalka oo dhan
1
IN CONSIDERATION OF RESOLUTION NO. 26-5646, FOR THE PURPOSE OF ADVANCING
PLANNING AND DESIGN OF METRO WEST COMMUNITY DROP-OFF DEPOT AND
ENDORSING OPTION B, OPTIMIZED DEPOT CONCEPT
Date: September 24, 2026
Department: Waste Prevention &
Environmental Services
Meeting Date: October 1, 2026
Prepared by: Estee Segal
Presenters: Marta McGuire, WPES Director;
Heidi Bertman, System Planning and Development
Program Director; Estee Segal, Principal Planner
Length: 5 minutes
ISSUE STATEMENT
The Regional System Facilities Plan, adopted by Metro Council in March 2025, identifies
development of a community drop-off depot in western Washington County as a priority
investment to improve access to reuse, recycling and waste services. Consistent with the plan,
Metro has completed initial conceptual planning for a depot at the Metro-owned property in
Cornelius. Staff developed and evaluated two concepts for the permanent depot. Option A (Compact
Depot) provides the core services identified in the System Facilities Plan within a smaller facility
footprint and at a lower estimated cost. Option B (Optimized Depot) provides the same core
services with additional space and flexibility to support reuse, education, community partnerships
and future programming as needs evolve. Staff evaluated the concepts based on facility size,
programming, operational needs, flexibility and cost, and gathered input from partners and the
Regional Waste Advisory Committee. Based on this analysis and engagement, staff recommend
advancing Option B as the preferred concept for the permanent depot. Council direction on the
preferred concept will allow staff to proceed with the next phase of planning and design.
ACTION REQUESTED
Approve Resolution 26-5646, endorsing Option B, Optimized Depot Concept, to be further planned and
designed for the development of the Metro West Community Drop-Off Depot.
IDENTIFIED POLICY OUTCOMES
The Regional System Facilities Plan establishes a long-term investment strategy for the region's
reuse, recycling and garbage infrastructure and is grounded in the values and goals of the 2030
Regional Waste Plan. Metro Council identified three priority outcomes to guide implementation of
the System Facilities Plan and future facility investments:
• Waste reduction: New facilities and programs should reduce waste and the amount of
material sent to landfill.
• Increased access: Improve the quality of, and access to reuse, recycling and garbage
services across the region.
• Affordability: Maintain affordable services and consider the cost impacts of system
investments on residents and businesses.
The Cornelius community drop-off depot is intended to advance these outcomes by addressing an
identified geographic gap in public services while expanding opportunities for reuse, recycling,
household hazardous waste collection and self-haul garbage services.
POLICY QUESTIONS
Does Council support advancing Option B as the preferred concept for the permanent Cornelius
community drop-off depot and proceeding with the next phase of planning and design?
2
POLICY OPTIONS FOR COUNCIL TO CONSIDER
1) Endorse Option B –Direct staff to proceed with the next phase of planning, design and
engineering, including development of the appropriate procurement approach.
2) Request Additional Concept Development – Direct staff to conduct additional conceptual
planning or pre-design work to further refine or evaluate the depot concepts before
proceeding to the next phase of design and engineering.
3) Select a Different Concept or Provide Additional Direction – Direct staff to advance a
different depot concept or provide additional direction regarding facility size, programming,
phasing, site utilization or other elements before proceeding with further design.
BACKGROUND AND REGIONAL NEED
Metro purchased an approximately 12-acre property in the Cornelius industrial area in 2020 as
part of a strategy to address a long-standing gap in public garbage and recycling services in
Washington County. A full-service transfer station was initially considered for the site based on the
perceived lack of public services on the west side of the region. Before proceeding with
development, Metro Council directed staff to take a broader look at regional facility needs, the
distribution and capacity of public and private facilities, and Metro's long-term role in providing
garbage and recycling services. That direction led to development of the Regional System Facilities
Plan, informed by regional data analysis, scenario modeling and community and stakeholder
engagement.
The System Facilities Plan found that the region has sufficient capacity to manage commercial wet
waste. The Forest Grove Transfer Station, approximately three miles west of the Cornelius
property, currently transfers approximately 74,000 tons of wet waste annually and has additional
available capacity. In contrast, the plan identified significant gaps in access to services for residents
and other public customers, particularly in Washington County and east Multnomah County.
Depending on where they live, residents and small businesses can face significant differences in
travel time and cost when seeking services for recyclables, household hazardous waste, self-haul
garbage, bulky items and reusable materials.
To address these gaps, the System Facilities Plan established a strategy to develop a network of
community drop-off depots across the region. These facilities are intended to provide convenient
access to reuse, recycling, household hazardous waste and self-haul garbage services without
duplicating commercial wet-waste transfer capacity that already exists within the regional system.
The plan identifies development of a community drop-off depot in Washington County as a Phase 1
priority. A depot at the Cornelius property is estimated to improve access to services for nearly
120,000 residents.
DEVELOPMENT APPROACH
Metro is pursuing a phased approach to development of the Cornelius property. The first phase is
an interim depot on approximately one acre of the property focused on providing household
hazardous waste services while planning, designing and permitting for the permanent facility
continue. The permanent community drop-off depot would provide a broader range of services,
including reuse, recycling, household hazardous waste and self-haul garbage services.
Staff and a consultant team have spent approximately six months evaluating the Cornelius site and
developing permanent depot concepts that can provide the services identified in the System
Facilities Plan while responding to zoning, land-use, site, operational and other jurisdictional
requirements. The conceptual planning process included coordination with City of Cornelius staff,
including the Development Director and City Engineer, as well as Metro operations staff. This work
3
informed considerations such as site circulation, traffic, facility programming, operational
functionality and future development of the property.
CONCEPTS CONSIDERED
Staff developed and evaluated two permanent depot concepts: a Compact Depot and an Optimized
Depot. Both concepts are intended to provide the core services identified in the Regional System
Facilities Plan but represent different approaches to facility scale, site utilization, programming and
long-term flexibility.
Consideration Option A- Compact Depot Option B- Optimized Depot
Overall
approach
Smaller permanent depot with a more
compact facility footprint
Larger permanent depot with additional
space and flexibility
Core
services
Provides core reuse, recycling, household
hazardous waste and self-haul services
Provides core reuse, recycling, household
hazardous waste and self-haul services
Reuse and
waste
reduction
Provides opportunities for reuse and
material recovery within a smaller
footprint
Provides additional flexibility for reuse,
repair, material recovery and future
programming
Future
flexibility
More limited space to accommodate
future programs or changing service
needs
Greater ability to adapt to future
programs, partnerships and changing
service needs
Site utilization Uses less of the property and preserves
more industrial land for other potential
uses
Uses a larger portion of the property to
support expanded programming and
operational flexibility
Construction
cost
Lower relative construction cost; current
rough-order-of-magnitude estimate of
approximately $17 million
Higher relative construction cost; current
rough-order-of-magnitude estimate of
approximately $23 million
Primary
tradeoff
Lower cost and smaller footprint, with
less flexibility for future programming
Greater initial investment and site use in
exchange for increased flexibility and
long-term service potential
STAFF RECOMMENDATION AND RATIONALE
Staff recommends advancing Option B, the Optimized Depot, as the preferred concept for the
permanent Cornelius community drop-off depot. While Option B requires a larger initial investment
and uses more of the Cornelius property than the Compact Depot, staff believe it provides stronger
long-term value and better supports the outcomes established in the Regional System Facilities
Plan. The recommendation is based on the following considerations:
• Access and service delivery: Option B provides sufficient space and operational capacity
to deliver the range of reuse, recycling, household hazardous waste and self-haul services
envisioned in the System Facilities Plan.
• Waste reduction and reuse: The larger concept provides greater flexibility to incorporate
reuse, repair, material recovery and partnerships that could further reduce the amount of
material sent to landfill.
• Long-term flexibility: Solid waste services and material streams will continue to change
over the life of the facility. Option B provides greater ability to accommodate new programs,
partnerships and service needs without requiring significant future expansion or redesign.
• Operational functionality: The concept provides additional flexibility for customer
circulation, material handling and facility operations, thereby increasing safety at the
facility, as the project moves into detailed design.
4
• Long-term community benefit: The additional space creates greater potential for
partnerships, education, community uses and other programming consistent with the
System Facilities Plan's long-term vision.
Staff recognize the importance of balancing these benefits against affordability, construction cost
and the use of industrial land. On balance, staff believe the additional flexibility and long-term
service potential of Option B justifies advancing the concept through the next phase of design and
engineering. Council endorsement of Option B would establish the preferred concept for purposes
of continued project development. It would not constitute approval of final design, final project
cost, bond issuance or construction.
FINANCIAL AND FUNDING CONSIDERATIONS
The consultant team developed rough-order-of-magnitude construction cost estimates for the
interim and permanent facilities based on the current conceptual level of design. The interim depot
is currently estimated to cost approximately $3 million in 2026 dollars to construct. Staff anticipate
funding the interim depot through WPES revenues and reserves on a pay-as-you-go basis. Funding
for the interim depot is included in the FY27 adopted and capital improvement plan.
Option B, the Optimized Depot, is currently estimated to cost approximately $23 million in 2026
dollars to construct. Staff anticipate financing construction of the permanent facility through
issuance of revenue bonds when the project has advanced sufficiently through design, permitting
and project development to be ready for construction. These estimates are preliminary and will be
refined as design and engineering progress, project risks are better understood, and the
construction procurement approach is established. Future project costs may also be affected by
construction escalation, permitting requirements, site conditions and the final scope and timing of
the project.
Advancing Option B through design does not authorize issuance of debt or construction of the
permanent facility. Those decisions would occur through subsequent budget, financing and Council
approval processes.
ENGAGEMENT AND PARTNER INPUT
Concept development has been informed by coordination with the City of Cornelius, Metro
operations staff, technical consultants and the Regional Waste Advisory Committee.
City of Cornelius and Technical Coordination
Staff has coordinated with City of Cornelius staff, including the Development Director and City
Engineer, to better understand land-use, transportation, infrastructure and development
considerations associated with the property. This coordination has helped inform site layout, traffic
circulation and other elements of the conceptual designs.
The consultant team was led by Scott Edwards Architecture, with JRMA providing solid waste
architecture and engineering expertise, and Harper Houf Peterson Righellis Inc. providing land-use
and civil engineering expertise.
Operational Input
Metro operations staff also participated in concept development to help evaluate facility
programming, customer and vehicle circulation, material handling and other operational
considerations. This input was incorporated into the conceptual plans presented for further review
and engagement.
5
Regional Waste Advisory Committee
The Regional Waste Advisory Committee reviewed the Cornelius project in February and July 2026.
In February, the committee reviewed the proposed phased development approach, including the
interim depot and early concepts for two differently sized permanent facilities. Committee
members expressed support for the interim depot and the phased approach as a way to begin
addressing the service gap in western Washington County while the permanent facility is
developed.
In July, the committee evaluated the Compact and Optimized depot concepts against the values and
outcomes of the Regional System Facilities Plan. Members were asked to identify the most
important considerations in selecting a preferred concept, indicate which concept best supports the
plan's values and outcomes, and provide feedback on what worked well and what could be
improved. When asked which concept best supports the Regional System Facilities Plan values and
outcomes, seven committee members selected the Optimized Depot and three selected the Compact
Depot. Members favoring the Optimized Depot most frequently emphasized its flexibility to
respond to future needs, additional opportunities for reuse and repair, potential for community and
educational uses, partnerships and long-term community benefit. Members favoring the Compact
Depot emphasized its smaller footprint and lower construction cost, efficient use of the property
and preservation of industrial land for other economic development opportunities.
Committee feedback reinforced the central tradeoff between minimizing near-term funding and
land requirements and providing greater flexibility and community benefit over the long-term life
of the facility. See Attachment D for the committee advisory report.
NEXT STEPS AND PROJECT DELIVERY
If Council endorses Option B as the preferred permanent depot concept, staff will proceed with the
next phase of project development. This phase will include refining the preferred concept through
design and engineering, conducting design and constructability review, and continuing
coordination with the City of Cornelius and the Oregon Department of Environmental Quality on
applicable land-use, building and environmental permitting requirements.
Staff will also continue engagement with community members, operational staff and project
partners as the design advances. In parallel, staff will develop and implement the appropriate
procurement strategy, refine capital and operating cost estimates and the project financing
approach, and further develop the project schedule. Staff will return to Council at key decision
points as the project advances toward final design and construction readiness.
Project timing will depend on design and constructability findings, permitting pathways and
approvals, procurement, continued engagement and other project development requirements.
Council endorsement of the preferred concept is an important project milestone, but additional
decisions regarding final project scope, financing and construction will occur as the project
advances.